Mclister Street

Demolition of existing perimeter roads.Concrete footpath 30m2.Kerb and channel 400m2.Storm water drainage 200lin.mSignage, line marking, bollardsAsphalt pavement 1,200m2.External concrete 400m2Bus sheltersRoot barrier between transmission gas line and future trees

Alfred Hospital, Melbourne

Demolition of existing roadKerb and channel 980 limnNew asphalt pavement 2,800 m2Asphalt re-sheet 2,500m2Concrete footpath 800m2Storm water drainageSignage, line marking, bollards, wheel stops, speed humpsPublic lightingWatermain upgradeLandscaping